Search results

Your search found 1494 results.

Filter your search results using the options below:

Manufacturer
Gauge
Category
Digital features
 
Era
 
Number of items to display per page: 5 | 10 | 20 | Show All
R30427
Northern Rail - Class 153 - '153360'
'OO' Gauge
Released: 27/01/26
DCC Ready (21 Pin)
Era 10
The Northern Rail franchise commenced in December 2004 and inherited its fleet from those of Arriva Trains Northern and First North Western, including a large number of Class 153 single units, of which No. 153360 was one. Under Northern Rail, the unit saw considerable use in the Carlisle area, including services on the Settle and Carlisle line and the Cumbria coastal line to Barrow-in-Furness. Arriva Rail North, Northern Rail’s successor from 2016, operated the largest fleet of Class 153 units in the UK. No. 153360 went into storage in late 2021 and was subsequently scrapped.
Our Price:
£152.99
R40477
LNER - 'West Riding Limited' - Brake Third & Kitchen Third - Coach pack
'OO' Gauge
Released: 19/02/26
Era 3
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, and named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley's ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.
Our Price:
£134.99
R40478
LNER - 'West Riding Limited' - Double Open First - Coach pack
'OO' Gauge
Released: 19/02/26
Era 3
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley's ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.
Our Price:
£134.99
R40479
LNER - 'West Riding Limited' - Open Third & Kitchen Third - Coach pack
'OO' Gauge
Released: 19/02/26
Era 3
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross, Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, and was named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley's ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.
Our Price:
£134.99
R40480
LNER - 'West Riding Limited' - Open Third & Brake Third - Coach pack
'OO' Gauge
Released: 19/02/26
Era 3
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley's ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.
Our Price:
£134.99